Malaysia Open-Geodata Observatory · Measured Nov 2026
Malaysia mapped. Ready to enrich at scale.
Across 1,685,285 road ways (416,929.6 km) measured nationwide across all 16 states and Federal Territories, only 38.3% of vehicle roads carry a name, 1.9% carry a speed limit, and 49,508 locations hold a complete 3-part address ahead of MCMC’s 12M+ 2027 National Address System.
“We should be careful not to equate authoritative data with navigation ready data.” Public comment in Malaysia’s 2026 geospatial data debate
Explore 15-city live map Major highways & Pan Borneo Compare all 16 states Candidate CSVs (116,961 roads)
Where Malaysia’s open map is strong, and where metadata unlocks national scale
Building a national measurement layer shows where geometry already exists (416,929.6 km mapped vs ~316,300 km gazetted under KKR’s MARRIS/MyINFRA ecosystem) and surfaces high-value naming, speed and address gaps cleanly by city and street ID.
1. Measure nationwide
Streaming node-and-way inspection across all 16 states & Federal Territories (1,685,285 road ways, 1,535,956 buildings, 31,913 civic places) from a single open ODbL baseline.
National PBF telemetry2. Surface candidate lists
Generate length-sorted CSV work queues across 15 major urban & regional hubs (116,961 unnamed vehicle ways spanning 17,821.4 km, incl. 85,389 Tier-1 streets) with direct OSM Way IDs.
15 cities live today3. Support custodian dialogue
Complement PLANMalaysia’s MUO/I-Plan and PGN’s MyGDI cleanly without redistributing restricted layers; any public comparison with government files awaits written permission under MyGDI SOP clauses 8.1.3 to 8.1.4.
Public-safe boundaryWhy visual tiles look complete while routing breaks (Geometry vs. Topology)
Physical road geometry is mapped almost everywhere (416,929.6 km), so a visual basemap looks finished. Yet routing graphs, emergency dispatch, and parcel delivery fail on downstream topology & metadata: vehicle naming (38.3%), oneway direction (18.7%), speed limits (1.9%), ramp destination=* tags (49.7% Peninsular · 5.4% Sabah), motorway exit refs (61.2%), and 3-part NAS addresses (0.41%).
AI & urban planning
- AI Malaysia Berhad (Jul 2026)28 initiatives
- PLANMalaysia MUO Ph 2RMK-13 / I-Plan
- National road baselineODbL open
NAS 2027 & parcel volume
- 2025 parcels (MCMC)1.57B / yr
- External location spendRM700M+ / yr
- 3-part OSM addr:* vs 12M49,508
Safety, NG999 & floods
- NG999 live (Nov 2025)800+ sites
- 2025 road toll6,537 deaths
- 2025 flood loss (DOSM)RM636.9M
15-city candidate road lists (116,961 unnamed vehicle ways · 17,821.4 km)
Every municipality in this observatory exports a ranked CSV sorted by tier (primary/secondary/tertiary/residential streets first, then unclassified feeders, then *_link ramps) and way length. Zero proprietary records touched.
| City / Municipality | Tier-1 streets | Total unnamed | Unnamed length | Queue download | Interactive view |
|---|---|---|---|---|---|
| Johor BahruSouth (Johor) | 9,590 | 15,375 | 2,076.7 km | Download CSV | |
| Kota BharuEast Coast (Kelantan) | 12,830 | 13,845 | 2,379.0 km | Download CSV | |
| SerembanSouth-Central (Negeri Sembilan) | 8,603 | 11,651 | 1,870.6 km | Download CSV | |
| KuchingEast Malaysia (Sarawak) | 10,060 | 11,469 | 1,933.9 km | Download CSV | |
| MelakaHistoric (Melaka) | 8,319 | 10,388 | 1,785.0 km | Download CSV | |
| KuantanEast Coast (Pahang) | 7,381 | 10,095 | 2,310.4 km | Download CSV | |
| Shah AlamCentral (Selangor) | 4,937 | 7,654 | 806.7 km | Download CSV | |
| Kuala TerengganuEast Coast (Terengganu) | 6,500 | 7,378 | 1,268.3 km | Download CSV | |
| Kuala LumpurCentral (FT) | 2,766 | 7,252 | 711.0 km | Download CSV | |
| IpohNorth-Central (Perak) | 4,751 | 6,827 | 891.9 km | Download CSV | |
| Kota KinabaluEast Malaysia (Sabah) | 4,136 | 5,336 | 742.3 km | Download CSV | |
| George TownNorth (Penang) | 3,473 | 4,846 | 524.8 km | Download CSV | |
| Petaling JayaCentral (Selangor) | 1,097 | 2,824 | 265.6 km | Download CSV | |
| PutrajayaCentral (FT) | 520 | 1,186 | 162.9 km | Download CSV | |
| CyberjayaCentral (Selangor) | 426 | 835 | 92.4 km | Download CSV |
Sample row inspection: longest Tier-1 unnamed streets in Putrajaya (Deep-Dive Case #1)
First 8 of 520 Tier-1 streets inside Putrajaya (within 1,186 ISPRS vehicle ways and 6,875 ways without maxspeed CSV).
| OSM way | Class | Length | Last edited | Direct edit link |
|---|---|---|---|---|
| Way 1180576852 | tertiary | 1,136.4 m | 2023-06-09 | Open in OSM |
| Way 606866025 | tertiary | 1,103.0 m | 2023-06-09 | Open in OSM |
| Way 130407335 | residential | 1,075.3 m | 2024-12-18 | Open in OSM |
| Way 139729829 | residential | 912.2 m | 2025-04-22 | Open in OSM |
| Way 139732599 | residential | 868.1 m | 2025-04-29 | Open in OSM |
| Way 1574045263 | tertiary | 765.4 m | 2026-11-01 | Open in OSM |
| Way 500013540 | residential | 748.9 m | 2026-09-22 | Open in OSM |
| Way 1574045264 | tertiary | 747.0 m | 2026-11-01 | Open in OSM |
15 cities across Malaysia. One spatial workbench.
Switch live across 15 cities nationwide, colour roads by naming status, edit age, or hierarchy, isolate vehicle corridors from service/footways, search streets in memory, or expand to full view for focused analysis.
Choose a measured city (15 live)
Putrajaya: 6,982 road ways, 192 selected places
Showing all 6,982 road ways across every highway class. Click any road or civic dot for metadata and its OSM link.
Filter civic & public places
Showing all 192 places in the dataset.
Putrajaya’s five landmark stops
192 mapped places in this dataset
All 16 states & territories, plus 15 cities benchmarked
National totals reveal sharp regional gaps: Klang Valley cities exceed 60%-75% naming, whereas rural and northern/east-coast states drop to 9.3%-25.6% (with East Coast capitals Kuala Terengganu at 10.1% and Kota Bharu at 16.7%). Overall, 517,534 vehicle road ways (146,360 km) across Malaysia still lack a street name.
All 16 States & Federal Territories compared
Showing 16 territories sorted by road ways.
| State / Territory | Road ways | Named vehicle % | Maxspeed | Edited ≤12 mo | Selected places | Full 3-part addr |
|---|---|---|---|---|---|---|
| SelangorMY-10 · rel 2932285 | 311,21351,565 km | 2.3% | 14.5%1,312 d median | 6,17572.9% named | 11,22795,174 any addr | |
| JohorMY-01 · rel 2939653 | 229,02648,106 km | 1.6% | 11.3%1,967 d median | 3,64971.1% named | 8,71432,888 any addr | |
| SarawakMY-13 · rel 3879784 | 156,88877,715 km | 2.5% | 14.6%2,306 d median | 2,62787.4% named | 10,45013,774 any addr | |
| PerakMY-08 · rel 4445076 | 140,30638,703 km | 1.1% | 8.0%2,388 d median | 3,70277.8% named | 2,04425,723 any addr | |
| SabahMY-12 · rel 3879783 | 136,87357,121 km | 2.6% | 6.2%2,337 d median | 1,95077.7% named | 3,6547,009 any addr | |
| KedahMY-02 · rel 4444908 | 127,96726,902 km | 1.6% | 10.7%2,330 d median | 2,18377.3% named | 1,3273,803 any addr | |
| Pulau PinangMY-07 · rel 4445131 | 99,08513,500 km | 1.9% | 8.5%2,083 d median | 2,33774.4% named | 5,77322,673 any addr | |
| PahangMY-06 · rel 4444595 | 92,43530,397 km | 1.2% | 13.0%2,328 d median | 1,65374.0% named | 4432,617 any addr | |
| KelantanMY-03 · rel 4443571 | 79,82618,895 km | 0.4% | 33.1%1,385 d median | 1,42272.2% named | 3222,249 any addr | |
| Kuala LumpurMY-14 · rel 2939672 | 77,1757,368 km | 5.9% | 25.9%817 d median | 2,23387.1% named | 4,61243,033 any addr | |
| Negeri SembilanMY-05 · rel 2939674 | 75,42516,591 km | 1.0% | 17.7%1,670 d median | 1,28175.7% named | 2736,073 any addr | |
| TerengganuMY-11 · rel 4444411 | 71,51616,446 km | 2.1% | 24.3%1,792 d median | 1,27381.3% named | 113582 any addr | |
| MelakaMY-04 · rel 2939673 | 50,9179,436 km | 1.3% | 18.2%1,961 d median | 92071.1% named | 4804,226 any addr | |
| PerlisMY-09 · rel 4444918 | 26,3244,644 km | 0.8% | 5.8%2,400 d median | 17274.4% named | 10209 any addr | |
| PutrajayaMY-16 · rel 4443881 | 6,969962 km | 1.5% | 13.0%1,099 d median | 19374.6% named | 28254 any addr | |
| LabuanMY-15 · rel 4521286 | 4,824745 km | 0.1% | 5.9%2,314 d median | 8885.2% named | 24609 any addr |
Freshness vs. street naming across all 16 states & territories
Comparing 12-month edit activity (X) against vehicle-road naming (Y) separates outliers immediately: Kelantan shows high recent geometry edits (33.1%) with low naming (12.7%), while Kuala Lumpur leads both axes. Hover or focus any dot.
Road distance composition by state (km mapped)
Total OpenStreetMap road distance split by vehicle roads named, vehicle roads unnamed, and non-vehicle service, agricultural track, or footpath links (Sarawak leads distance at 77,715 km, mostly tracks and unnamed rural corridors).
Where Malaysia’s street-naming gap sits (by highway class)
Motorways (99.2%) and trunks (88.2%) are well covered. The national bottleneck lies in last-mile residential (33.1% of 533,121 ways) and unclassified (26.5%) corridors.
Malaysian street-prefix share (321,010 named vehicle ways)
Proportional prefix distribution used for NLP address parsing ahead of MS 2039 / NAS, showing regional variety across Jalan, Lorong, Persiaran, Lebuhraya, and Penang/Perak Lebuh / Laluan terms.
National road-edit timeline across Malaysia (2008-2026)
Last-edited timestamp across all 1,685,285 Malaysian road ways. Notice the 2020 mapping peak (554,135 ways edited in one year, roughly a third of the national network) leaving a 1,973-day median age.
Build & save a custom segment in Workbench
15 regional cities live in the interactive map (522,632 roads · 10,828 civic places)
Measured across Peninsular North, Central Klang Valley, South-Central, Historic Melaka, South, East Coast (Kuantan, Kuala Terengganu, Kota Bharu), and Sabah/Sarawak. Click any city name to inspect its road network and civic places on the map. Note: the 16-state table above uses the strict PBF polygon clip (Putrajaya: 6,969 ways), while city maps use the Overpass municipal relation extract (Putrajaya: 6,982 ways, including 13 boundary-straddling segments). Cyberjaya’s upstream boundary relation 10043206 carries fixme: roughly, leaving minor fringe parks outside the polygon (disclosed upstream). Downloads: National & 16-state JSON · 15-city comparison JSON.
| City | Road ways | Named vehicle | Maxspeed | Edited ≤12 mo | Median age | Selected places | Full addr |
|---|---|---|---|---|---|---|---|
| South (Johor) · rel 12306920 | 87,26312,678 km | 67.7%32,154 / 47,529 | 1.7% | 11.1% | 1,748 d | 1,36267.0% named | 6,087 |
| Central (FT) · rel 2939672 | 77,1947,348 km | 74.8%21,472 / 28,724 | 5.9% | 25.9% | 816 d | 2,21787.4% named | 4,616 |
| Central (Selangor) · rel 8347577 | 43,2046,030 km | 61.4%12,183 / 19,837 | 2.7% | 13.8% | 1,397 d | 86672.6% named | 904 |
| South-Central (Negeri Sembilan) · rel 10976198 | 41,4257,387 km | 50.4%11,858 / 23,509 | 1.2% | 21.5% | 1,246 d | 60771.2% named | 233 |
| East Coast (Pahang) · rel 10744343 | 36,9987,177 km | 39.3%6,535 / 16,630 | 0.8% | 18.9% | 2,222 d | 50569.7% named | 317 |
| East Malaysia (Sarawak) · rel 15971408 | 36,2035,461 km | 36.0%6,455 / 17,924 | 0.7% | 14.8% | 2,288 d | 59488.4% named | 691 |
| North-Central (Perak) · rel 18225051 | 35,2675,448 km | 67.5%14,160 / 20,987 | 1.9% | 9.8% | 1,851 d | 1,05162.1% named | 588 |
| North (Penang) · rel 11203697 | 34,0643,905 km | 64.7%8,886 / 13,732 | 2.9% | 15.5% | 1,716 d | 1,19678.2% named | 3,913 |
| East Coast (Kelantan) · rel 6311590 | 29,9214,222 km | 16.7%2,774 / 16,619 | 0.5% | 55.7% | 264 d | 56471.8% named | 273 |
| Historic (Melaka) · rel 4463194 | 28,5594,319 km | 34.9%5,580 / 15,968 | 1.1% | 19.1% | 1,866 d | 51173.6% named | 449 |
| Central (Selangor) · rel 8347386 | 24,5852,747 km | 75.8%8,836 / 11,660 | 3.8% | 14.8% | 1,054 d | 50885.2% named | 1,925 |
| East Malaysia (Sabah) · rel 15975929 | 22,3622,622 km | 44.4%4,257 / 9,593 | 4.8% | 10.4% | 1,593 d | 35367.1% named | 3,211 |
| East Coast (Terengganu) · rel 12570056 | 14,1262,046 km | 10.1%829 / 8,207 | 1.6% | 45.9% | 645 d | 22383.9% named | 29 |
| Longitudinal case · Central (FT) · rel 4443881 | 6,982954 km | 61.4%1,886 / 3,072 | 1.5% | 13.1% | 1,099 d | 19272.9% named | 28 |
| Central (Selangor) · rel 10043206 | 4,479597 km | 54.4%998 / 1,833 | 1.7% | 17.8% | 1,055 d | 7970.9% named | 60 |
Major highways, expressways & corridor registers
Built for highway concessionaires, LLM, KKR/JKR, MIROS, and corridor planners: cross-checking JKR’s Buku Statistik Jalan Edisi 2025 (data at 31 Dec 2024) and LLM’s live ArcGIS REST registers against live OpenStreetMap motorway, ramp, and exit-node coverage.
1. Official register collisions & length deltas
LLM’s 36 ArcGIS layers resolve to only 30 distinct E-codes (4 collisions), while JKR Edisi 2025 (unlisted 31 Dec 2024 PDF, 340,169 km total) froze tolled lane-km at 9,787.6 across two editions:
| Code / Route | Collision / Official mismatch | Delta |
|---|---|---|
E1 | PLUS NSE North + NKVE (35 km) | Collision |
E8 | KLK (60) + LPT1 (174.5) + LPT2 (183.4) | Collision |
E19 / E33 | SUKE + MEX (E19) · DUKE + SPE (E33) | Collision |
WCE (E32) | 143.72 AR24 vs 180 IJM FY25 vs 233 full | +89 km |
| SUKE · SPE · LKSA | 22.98/31.8 · 20.67/32 · 8.90/14.7 km | +5–11 km |
2. Ramps, exits & segment speed coverage
Mainlines match official dual-carriageway km cleanly, yet newer expressways, interchange ramps (1,302 d median age), and exit nodes carry steep tagging gaps:
Lagging speed tags: EKVE 0.0% · WCE 13.9% · NNKSB 15.2% · LKSA 22.6% · SUKE 26.2%.
3. Sabah, Sarawak (toll-free trunk) & LTU
East Malaysia has zero LLM toll expressways; highways (Pan Borneo / AH150 / FT1 / FT13 / FT22) run as toll-free trunks. Sabah lags sharply on speed and ramp-destination tags:
| Corridor / State | OSM Trunk · Ramps | Official / Status |
|---|---|---|
| Sarawak trunks | 2,257 km · 68.0% speed · 214 d | Ph 1 786 km (10/11 done; WP11 99.9%) |
| Sabah trunks | 1,210 km · 20.5% speed | Ph 1 706 km (1A 89.5% · 1B 25.5%) |
| Sabah ramp dest | 666 ramps · 5.4% dest | vs Sarawak 39.1% · Peninsular 49.7% |
| LTU FT34 & Safety | 299.4 km (41.3% AR24) | 26,675 tolled crashes (839 fatal, 2025) |
4. Authority digital readiness & factual boundary
- MyGOS centrelines (1,050 Fed + 4,750 State)Open · no copyright
- EXIT & speed GIS (ATJ 2E/87 · ends 2016 CSV)No public API
- AwAS cameras (46 active of 49 listed)Prose km only
- LLM R&R GIS layers (48 vs 49 · blank amenities)Schema conflict
- MLFF contract (lapsed Dec 2024 → B2B 2027)0 LKAN findings
- Nav / NG999 live feeds (10 weak-signal highways)0 feeds · delay unproven
Expressway & East Malaysia trunk ledger (33 E-routes + Sarawak & Sabah Pan Borneo)
Compare official KKR AR2024 / Pan Borneo Ph 1 lengths against LLM directory/GIS variants and live OSM dual-carriageway geometry, maxspeed %, lanes/toll tags, and edit age. Click any row to zoom the map.
| Code & corridor | Official km | OSM carriageway | Maxspeed % | Lanes · Toll | Median age | Status / registry note |
|---|---|---|---|---|---|---|
| E1 · NSE North + NKVEPLUS | 465.15 kmLLM dir/GIS: — | 937.2 km1,121 ways | 98.3%110 km/h (794), 90 km/h (247), 60 km/h (42) | 100.0% · 98.1%lanes · toll | 481 d | Operational (E1 collision: NSE + NKVE 35 km) |
| E2 · NSE South CorridorPLUS | 312.00 kmLLM dir/GIS: — | 622.8 km752 ways | 98.7%110 km/h (669), 90 km/h (68), 60 km/h (5) | 99.6% · 91.8%lanes · toll | 550 d | Operational |
| E3 · LINKEDUA / Second LinkPLUS | 45.72 kmLLM dir/GIS: — | 95.4 km287 ways | 97.2%110 km/h (279) | 99.3% · 46.3%lanes · toll | 555 d | Operational |
| E5 · KESASKESAS Sdn Bhd | 34.30 kmLLM dir/GIS: — | 69.0 km184 ways | 97.3%90 km/h (163), 60 km/h (8), 80 km/h (6) | 95.1% · 53.8%lanes · toll | 94 d | Operational |
| E6 · ELITEPLUS | 59.69 kmLLM dir/GIS: — | 122.2 km200 ways | 89.0%110 km/h (84), 90 km/h (81), 60 km/h (8) | 92.0% · 74.5%lanes · toll | 556 d | Operational |
| E7 · Cheras-Kajang (Grand Saga)Grand Saga Sdn Bhd | 11.50 kmLLM dir/GIS: — | 23.2 km130 ways | 32.3%90 km/h (34), 50 km/h (6), 60 km/h (2) | 100.0% · 23.1%lanes · toll | 1,172 d | Operational |
| E8 · KLK + LPT1 + LPT2ANIH / LPT2 Sdn Bhd | 417.88 kmLLM dir/GIS: — | 837.8 km562 ways | 77.8%110 km/h (335), 90 km/h (91), 80 km/h (11) | 99.1% · 83.8%lanes · toll | 1,592 d | Operational (E8 collision: 60.0 + 174.5 + 183.38 km) |
| E9 · BESRAYABesraya / IJM | 28.40 kmLLM dir/GIS: — | 46.5 km243 ways | 91.8%60 km/h (97), 90 km/h (60), 80 km/h (37) | 100.0% · 21.8%lanes · toll | 401 d | Operational (IJM FY25 AR: 28.9 km) |
| E10 · NPENPE / IJM | 19.60 kmLLM dir/GIS: — | 35.3 km216 ways | 88.9%80 km/h (105), 60 km/h (83), 20 km/h (3) | 99.1% · 44.0%lanes · toll | 369 d | Operational |
| E11 · LDPLITRAK | 39.30 kmLLM dir/GIS: — | 76.0 km414 ways | 95.7%60 km/h (147), 80 km/h (130), 90 km/h (97) | 98.8% · 22.9%lanes · toll | 363 d | Operational |
| E12 · AKLEHPROLINTAS | 7.89 kmLLM dir/GIS: 7.40 km | 13.6 km70 ways | 85.7%80 km/h (44), 60 km/h (14), 70 km/h (2) | 100.0% · 32.9%lanes · toll | 400 d | Operational (7.89 KKR vs 7.4 LLM GIS) |
| E13 · LKSAPROLINTAS | 8.90 kmLLM dir/GIS: 14.70 km | 14.3 km53 ways | 22.6%60 km/h (10), 50 km/h (2) | 81.1% · 20.8%lanes · toll | 1,876 d | Operational (8.90 KKR vs 14.7 directory) |
| E15 · BKEPLUS | 16.78 kmLLM dir/GIS: — | 29.8 km70 ways | 65.7%90 km/h (43), 60 km/h (3) | 100.0% · 88.6%lanes · toll | 2,432 d | Operational |
| E17 · LLB (Butterworth Ring)LLB Sdn Bhd | 18.93 kmLLM dir/GIS: — | 36.4 km171 ways | 73.1%80 km/h (123), 20 km/h (2) | 100.0% · 29.2%lanes · toll | 501 d | Operational |
| E18 · SILKSILK Sdn Bhd | 37.00 kmLLM dir/GIS: — | 75.1 km380 ways | 57.1%90 km/h (98), 80 km/h (73), 60 km/h (15) | 100.0% · 51.1%lanes · toll | 1,068 d | Operational |
| E19 · SUKEPROLINTAS | 22.98 kmLLM dir/GIS: 31.80 km | 43.3 km61 ways | 26.2%80 km/h (7), 60 km/h (7), 70 km/h (2) | 42.6% · 9.8%lanes · toll | 320 d | Operational (E19 collision with MEX in LLM GIS) |
| E20 · MEXMaju Expressway | 25.38 kmLLM dir/GIS: — | 49.3 km100 ways | 98.0%60 km/h (38), 90 km/h (25), 80 km/h (25) | 100.0% · 91.0%lanes · toll | 934 d | Operational (KKR E20; LLM GIS E19) |
| E21 · LEKASLEKAS / IJM | 44.28 kmLLM dir/GIS: — | 90.0 km126 ways | 50.8%110 km/h (48), 80 km/h (10), 60 km/h (3) | 81.7% · 81.0%lanes · toll | 11 d | Operational |
| E22 · Senai-Desaru (SDE)SDE Berhad | 77.20 kmLLM dir/GIS: — | 152.1 km195 ways | 56.9%110 km/h (76), 90 km/h (28), 60 km/h (7) | 100.0% · 68.2%lanes · toll | 564 d | Operational |
| E23 · SPRINTSPRINT Sdn Bhd | 26.00 kmLLM dir/GIS: — | 39.0 km217 ways | 85.3%60 km/h (87), 80 km/h (47), 70 km/h (44) | 100.0% · 8.8%lanes · toll | 402 d | Operational |
| E25 · LATARLATAR Berhad | 30.70 kmLLM dir/GIS: — | 60.5 km132 ways | 69.7%110 km/h (91), 50 km/h (1) | 95.5% · 43.9%lanes · toll | 1,288 d | Operational (30.7 / 33 / 60 across sources) |
| E26 · SKVESKVE Holdings | 52.98 kmLLM dir/GIS: — | 64.7 km183 ways | 81.4%80 km/h (100), 90 km/h (39), 60 km/h (10) | 86.9% · 65.6%lanes · toll | 298 d | Operational |
| E27 · EKVE (East Klang Valley)EKVE Sdn Bhd | 39.60 kmLLM dir/GIS: 16.78 km | 32.1 km49 ways | 0.0%— | 0.0% · 100.0%lanes · toll | 11 d | Section 1 opened 30 Aug 2025 (16.8 km + 8.4 km ramps) |
| E28 · Penang Second BridgeJambatan Kedua | 24.00 kmLLM dir/GIS: — | 45.7 km59 ways | 100.0%80 km/h (59) | 100.0% · 10.2%lanes · toll | 549 d | Operational |
| E29 · Seremban-Port DicksonPLUS | 22.75 kmLLM dir/GIS: — | 45.6 km61 ways | 100.0%110 km/h (58), 90 km/h (3) | 96.7% · 9.8%lanes · toll | 2,362 d | Operational |
| E30 · NNKSB (Grand Sepadu)Grand Sepadu | 17.50 kmLLM dir/GIS: — | 36.1 km79 ways | 15.2%60 km/h (12) | 53.2% · 34.2%lanes · toll | 1,210 d | Operational |
| E31 · DASHPROLINTAS | 16.30 kmLLM dir/GIS: 20.10 km | 32.7 km58 ways | 89.7%80 km/h (41), 60 km/h (11) | 37.9% · 8.6%lanes · toll | 359 d | Operational (16.30 vs 20.1 km) |
| E32 · WCE (West Coast)WCE Sdn Bhd | 143.72 kmLLM dir/GIS: 233.00 km | 301.6 km259 ways | 13.9%110 km/h (36) | 30.1% · 99.2%lanes · toll | 849 d | Phased (143.72 AR24 / 180 IJM FY25 / 233 full) |
| E33 · DUKE + DUKE2KESTURI / Ekovest | 30.67 kmLLM dir/GIS: 18.00 km | 49.8 km240 ways | 64.6%90 km/h (116), 80 km/h (17), 50 km/h (14) | 95.4% · 27.5%lanes · toll | 399 d | Operational (E33 collision with SPE) |
| E35 · GCE (Guthrie)PROLINTAS | 25.00 kmLLM dir/GIS: — | 48.4 km180 ways | 47.8%90 km/h (55), 110 km/h (28), 60 km/h (3) | 100.0% · 76.7%lanes · toll | 2,475 d | Operational |
| E36 · Penang BridgePLUS | 17.40 kmLLM dir/GIS: — | 22.1 km42 ways | 100.0%80 km/h (36), 100 km/h (4), 70 km/h (2) | 100.0% · 19.0%lanes · toll | 2,433 d | Operational |
| E38 · SMART TunnelSMART Sdn Bhd | 7.50 kmLLM dir/GIS: — | 11.8 km24 ways | 70.8%60 km/h (17) | 100.0% · 83.3%lanes · toll | 396 d | Operational |
| E39 · SPE (DUKE Fasa 3)Ekovest | 20.67 kmLLM dir/GIS: 32.00 km | 39.1 km59 ways | 100.0%50 km/h (23), 60 km/h (20), 80 km/h (15) | 94.9% · 13.6%lanes · toll | 366 d | Operating (LLM GIS E33 under construction) |
| PB-SWK · Pan Borneo & Sarawak Trunks (FT1-* / 802)KKR / JKR Sarawak (Toll-free) | 786.00 kmLLM dir/GIS: — | 2,257.1 km2,854 ways | 68.0%90 km/h (1577), 80 km/h (183), 60 km/h (72) | 91.5% · 0.0%lanes · toll | 214 d | Ph 1: 10/11 WPs done, WP11 99.9% (Mar 2026); 0 tolled E-routes |
| PB-SBH · Pan Borneo & Sabah Trunks (FT1/13/22/A5)KKR / JKR Sabah (Toll-free) | 706.00 kmLLM dir/GIS: — | 1,210.1 km1,735 ways | 20.5%90 km/h (206), 70 km/h (96), 50 km/h (24) | 61.7% · 0.0%lanes · toll | 842 d | Ph 1: 1A 89.5%, 1B 25.5% (Oct 2026); 0 tolled E-routes |
Custom segment & benchmark workbench
Assemble your own focus slice across any combination of the 16 states or 15 cities. Drag metrics to reorder priority (or use arrows on touch devices), compare axes visually, export CSV, or save custom views locally in this browser.
Putrajaya longitudinal case (2018-2026) & three-way public endpoint audit
Why keep a granular Putrajaya case study inside a national observatory? Putrajaya has a published 2018 academic OSM baseline (ISPRS) plus accessible federal and municipal REST endpoints, allowing an 8-year trend check and a live 3-way public source comparison that shows why a shared measurement layer adds clarity.
Putrajaya navigation tags (6,982 ways)
Ways carrying both name and maxspeed: 1.3%; 22 connected components (99.2% of length in main graph); 666 turn-restriction relations.
2018 vs 2026 vehicle roads (3,072 ways)
Naming rose +2.4 points in eight years (from 59% to 61.4%). Buildings grew from 25 residential ways in 2018 to 3,103 today, yet only 150 Putrajaya features carry core addr:* tags (32 with all three).
How three public Putrajaya road views compare on the same day (16 Nov 2026)
Aggregate counts queried from public endpoints illustrate divergence between municipal records, federal mirrors and open data. This shows why a public measurement baseline complements custodian layers without copying restricted records:
| Public source | Role / Licence | Road features | Unnamed | Observed metadata |
|---|---|---|---|---|
PPJ ArcGIS (Kelulusan_Tanah/MapServer/4) | Local authority · copyrightText: "" (not open-licensed) | 5,139 | 190 (3.7%) | 3,958 features (77%) carry a populated new_name renames ledger |
MyGOS (Hosted/Jalan_Putrajaya) | Federal portal · no open licence | 1,392 | 369 (26.5%) | Last edited 2026-04-14; diverges sharply from PPJ’s 5,139-feature copy |
| OpenStreetMap (measured snapshot) | Public · ODbL 1.0 | 6,982 | 520 Tier-1 streets | 3,072 ISPRS vehicle ways (1,186 total without name incl. unclassified & links) |
Spatial proximity check (aggregate only): 1,094 of 1,186 unnamed OSM vehicle ways (92.2%) lie within 25 m of a named PPJ segment (1,031 within 5 m; 1,058 within 10 m). The street names already exist in a public municipal endpoint — meaning the bottleneck is not field survey, but licensing clarity (copyrightText: "" vs. an explicit ODbL waiver or MyGDI SOP §7.2.2 clearance).
Selected Putrajaya places (192 features)
Putrajaya building & address governance context
Under PPJ’s OSC checklist, PPJ assigns numbers to the overall plot while consultants propose strata/unit numbers, keeping plot vs unit counts distinct. Historical reference: DOSM’s Aug 2014 MSAR pilot (KL/Putrajaya/Selangor, n=2,618) auto-matched 58.9% and completed 41.1% through manual cleansing.
Putrajaya road naming across all 20 OSM highway classes (6,982 ways, 953.9 km)
| Highway class | Scope | Ways | Named | Named % | Length |
|---|---|---|---|---|---|
| service | Non-vehicle / other | 2,499 | 34 | 1.4% | 240.25 km |
| footway | Non-vehicle / other | 960 | 14 | 1.5% | 112.71 km |
| residential | ISPRS vehicle | 916 | 614 | 67.0% | 131.26 km |
| tertiary | ISPRS vehicle | 643 | 476 | 74.0% | 85.30 km |
| unclassified | ISPRS vehicle | 498 | 221 | 44.4% | 74.76 km |
| secondary | ISPRS vehicle | 326 | 299 | 91.7% | 52.73 km |
| primary | ISPRS vehicle | 280 | 256 | 91.4% | 88.76 km |
| cycleway | Non-vehicle / other | 170 | 0 | 0.0% | 63.57 km |
| primary link | ISPRS vehicle | 157 | 0 | 0.0% | 28.78 km |
| tertiary link | ISPRS vehicle | 110 | 0 | 0.0% | 5.83 km |
| path | Non-vehicle / other | 103 | 0 | 0.0% | 23.59 km |
| secondary link | ISPRS vehicle | 101 | 1 | 1.0% | 4.71 km |
| steps | Non-vehicle / other | 81 | 1 | 1.2% | 2.54 km |
| track | Non-vehicle / other | 46 | 0 | 0.0% | 15.71 km |
| pedestrian | Non-vehicle / other | 31 | 1 | 3.2% | 7.02 km |
| motorway link | ISPRS vehicle | 20 | 5 | 25.0% | 3.98 km |
| construction | Non-vehicle / other | 18 | 0 | 0.0% | 6.42 km |
| motorway | ISPRS vehicle | 14 | 14 | 100.0% | 3.29 km |
| trunk link | ISPRS vehicle | 7 | 0 | 0.0% | 1.99 km |
| proposed | Non-vehicle / other | 2 | 0 | 0.0% | 0.71 km |
Using & verifying the open data
Everything in Geodata MY is built from public ODbL data and published official endpoints. There is no ask attached — take the baseline, inspect the queues, or check where your corridor stands.
How anyone can act on these measurements today
1. Inspect any city or highway
Switch across 15 cities nationwide on the interactive map, check expressways & Pan Borneo, or download any municipality’s sorted CSV from Candidate CSVs.
2. Enrich from ground truth
Verify names or speed limits from physical signage, field survey, or open street-level imagery (never copy proprietary maps), then map straight into OpenStreetMap.
3. Reuse & cite the open baseline
Every JSON scorecard, GeoJSON extract, and candidate queue is downloadable under Method & licence for council reviews, hackathons, or research.
Open ecosystem context
Alongside AI Malaysia Berhad (2026-2030), PLANMalaysia’s MUO/I-Plan and MCMC’s 2027 NAS, we welcome feedback from planners, GIS teams and builders on which state or corridor gaps matter most in practice.
If an agency ever wants a small check
Even though measurements span all 16 states and 15 cities, any spot-check works best small and low-friction — e.g. glancing at a sample from Putrajaya’s 520 Tier-1 unnamed streets under MyGDI SOP rules. Read the one-page validation outline →
Which layer moves the needle first?
Suburban & east-coast street naming (517,534 unnamed vehicle ways nationwide), speed-limit completeness (1.9% national), or address preparation ahead of NAS 2027?
How can public & custodian checks complement each other?
Whether MyGDI SOP clause 7.2.2 supports internal reference checks while raw government layers remain strictly private inside agencies.
Which corridor matters most next?
Peninsular hubs already live (Penang, Ipoh, Seremban, Melaka, JB, Kuantan, KT, Kota Bharu), East Malaysia (KK, Kuching), federal expressways, or industrial mukims?
Reproduce every number and verify every citation
1. Snapshot parity & boundaries
- National & 16-state PBF:
openstreetmap.frmax timestamp2026-11-14T19:56:50ZODbL 1.0 - Overpass snapshots: KV 15 Nov · Melaka, Seremban, KB, KT & Highways 16 NovVerified
- Admin borders: Malaysia
2108121+ all 16MY-01..16(+3 coastal fallback)pyosmium - Road class taxonomy: ISPRS 2018 12 vehicle classes +
*_linkramps666 turns
2. Public licence & open datasets
Zero custodian geometry redistributed; CDN dark/light basemaps on staging only (prod uses self-hosted PMTiles). Cite as: Malaysia Open-Geodata Observatory (khanster.net), 15–16 Nov 2026.
3. Verify it yourself in 10 minutes
Every headline number on this page traces to a public source. Three spot-checks need nothing but a browser or a terminal:
- National baseline — download malaysia-national.json and read
country.road_ways: it is1,685,285(as of the 2026-11-15 PBF snapshot).ODbL 1.0 - Putrajaya way count —
curl "https://overpass-api.de/api/interpreter?data=[out:json];area(3604443881)->.a;way["highway"](area.a);out count;"returns ≈6,982(drifts with every edit; we measured 6,982 on 2026-11-15).public API - PPJ road count —
curl "https://web2.ppj.gov.my/server/rest/services/Kelulusan_Tanah/MapServer/4/query?where=1%3D1&returnCountOnly=true&f=json"returns{"count":5139}as of 2026-11-16. (PPJ publishes no reuse licence; we republish aggregate counts only.)public endpoint - The full pipeline (scripts, tests, measurement JSONs) is available on request via khanster.net. Every number on this page traces to the public sources listed above.on request
Malaysian standards, institutional landscape & ASEAN peers
| Framework / Agency | Scope & custodian | Operational relevance here |
|---|---|---|
| AI Malaysia Berhad (formerly NAIO) | Ministry of Digital (ai.gov.my, launched 28 Jul 2026) | 28-initiative National AI Action Plan (2026-2030) pairs 14 Impact Engines (incl. smart cities) with 14 Data/Compute Enablers. |
| PLANMalaysia MUO Phase 2 & I-Plan | PLANMalaysia / KPKT (planmalaysia.gov.my) | MUO tracks SDG 11/urban big data (RMK-13); I-Plan visibly combines OSM basemaps with local zoning layers. |
| MyGDI SOP (Jan 2024) & MS 1759 | PGN / NRES (TA0060 roads, mygos) | SOP §7.2.2 outlines G2B sharing; §§8.1.3-8.1.4 gate public custodian comparisons on written permission. |
| MCMC NAS (Act 741 §57) & MS 2039 | MCMC / Jabatan Standard Malaysia | Targets 12M+ geocoded addresses (2025-2027) to cut RM700M+/yr foreign location spend; DMS 2039 at stage 30.20. |
| JKR Edisi 2025, MARRIS & LLM | KKR / JKR / LLM / MoF | Edisi 2025 tracks 340,169 km total (20,858.6 km Federal incl. 2,128.07 km tolled); LLM operates 36 ArcGIS layers; state roads moving from MARRIS to MyINFRA. |
| NG999 Emergency Dispatch | Ministry of Communications / TM | Went live Nov 2025 (800+ sites, 50k-70k daily calls); relies on structured mukim/address and local road-network routing. |
| Singapore OneMap & Indonesia KSP | SLA (onemap.gov.sg) · BIG (Perpres 23/2021) | ASEAN models pairing multi-agency spatial governance with open REST APIs (geocoding, routing, thematic layers). |
Spatial proximity check (aggregate only): 1,094 of 1,186 unnamed OSM vehicle ways (92.2%) lie within 25 m of a named PPJ segment (1,031 within 5 m; 1,058 within 10 m). The street names already exist in a public municipal endpoint — meaning the bottleneck is not field survey, but licensing clarity (copyrightText: "" vs. an explicit ODbL waiver or MyGDI SOP §7.2.2 clearance).
Cited primary references (verified 2026-11-15/16)
- AI Malaysia Berhad & National AI Action Plan 2026-2030: Official National AI Portal: ai.gov.my
- PLANMalaysia Urban Observatory & I-Plan: Official PLANMalaysia Portal: planmalaysia.gov.my
- 2018 Putrajaya OSM Quality Baseline: Husen, S. N. R. M., Idris, N. H., & Ishak, M. H. I. (2018), The Quality of OpenStreetMap in Malaysia: A Preliminary Assessment, ISPRS Archives XLII-4/W9, 291-298: isprs-archives.copernicus.org/articles/XLII-4-W9/291/2018/
- MyGDI Sharing Policy & Fundamental Data List: Pusat Geospatial Negara (NRES): mygeoportal.gov.my/ms/perkongsian-data-mygdi · mygeoportal.gov.my/faq?page=0
- Putrajaya Verification Procurement & PPJ GIS Metadata: PGN/JUPEM
SH6_2025, Act 133, OSC Checklist & PPJ ArcGIS: jupem.gov.my/…/SH6_2025-1750737016.pdf · web2.ppj.gov.my/…/Kelulusan_Tanah/MapServer/4 - JUPEM Commercial, UPI & PDNG Portals: ebiz.jupem.gov.my · mygeoserve.jupem.gov.my/data-catalog · mygos.mygeoportal.gov.my/upi/
- DOSM MSAR Benchmark & Open Data (CC BY 4.0): statistics.gov.my/…/file_20221106233830.pdf · data.gov.my/data-catalogue/poskod
- National Address Mandate (Act 741 §57) & MS 2039:2006: mcmc.gov.my/…/Akta-741.pdf · govdocs.sinarproject.org/…/ms-2039-2006
- OSM Extract, Malaysia Conventions & ODbL 1.0: download.openstreetmap.fr/extracts/asia/ · wiki.openstreetmap.org/wiki/Malaysian_Roads_Tagging · opendatacommons.org/licenses/odbl/1-0/
- ASEAN & Commonwealth Precedents: Singapore SLA onemap.gov.sg/apidocs/ · Australia icsm.gov.au/…/g-naf · UK GeoPlace static.geoplace.co.uk/…/DCA.pdf
- Highways, LLM Registry & Traffic Enforcement: JKR Buku Statistik Jalan Edisi 2025 (PDF) · LLM AR 2024 (PDF) & GIS REST (MapServer) · JPJ AwAS (PDF) · PAC MLFF
DR.2/2025(PDF)